| Table
of Contents
Contents
of Section:
Detailed Business
Electronic
EDI Procedures
Summary
Detailed Business Cycle Current/Revised Summary
Electronic Commerce Interim Support with Dofasco Summary
|
Electronic
Commerce / Implementation Guide
Chapter 2 Dofasco wants to work with our Outside Processors and Storage Facilities
In this Chapter we have outlined EDI procedures, along with the current
We have also listed Dofasco experts, ready and willing to work with
you
2.1 EDI ProceduresThere are a few Dofasco procedures that we'd like to explain to you inthe form of some commonly asked questions and answers. We've also included a checklist to help you get started implementing EDI. The transaction sets, their data segments lists and the data element
values
In this document, we:
answers you need 2.1.1 OverviewIn this document, we discuss the:
2.1.2 COMPORD VersionCOMPORD was the industry standard and can be supportedby Dofasco. The preferred standard however, is ANSI ASC X12. 2.1.3 ANSI ASC X12 VersionEffective immediately all new EDI links with Outside Processors andStorage Facilities will use version 3030. However, as the ANSI publishes revised transactions, Dofasco expects to use version 3040. Installed EDI transactions will be left “as is” unless there is a business reason to change. Dofasco VAN Dofasco is using GEIS for all VAN - based
electronic commerce
ANX Dofasco is using the ANX for a major part of its EDI exchanges and currently only supports FTP file transfers. The ANX is preferred over a VAN connection to minimise costs. VAN Mailbox Exchange Requirement Dofasco will be exchanging transactions with our
VAN on an
Outside Processor Roles and Responsibilities We have defined the roles and responsibilities
of Outside Processors
What are Dofasco's EDI Standards? Over the years, a variety of standards have been
developed, which
Most industries and/or companies are now adopting
Implementation
For further clarification, ANSI is the acronym
for the American National
What are the costs? Your costs will depend on a number of factors. Start up costs include hardware and software costs. If you have a computer and modem, you are part way there. You'll also need translation software, communications software and a mailbox on a VAN (Value-Added Network) or subscribe to the ANX service. Typical start up costs can vary, depending on the platform you using and your existing environment. Ongoing costs include the maintenance of the standards, transmission costs to send your electronic transactions over the network and monthly mailbox fees. Generally these costs are considered the cost
of doing business.
Why do we use commercial networks? In the electronic world, networks become your electronic courier, ensuring your electronic messages reach their destination on time. Commercial networks insulate Trading Partners from the specific technology configurations at each company, and typically support "one-to-many" communications links. Dofasco prefers to avoid proprietary or private solutions. Dofasco uses GEIS as our VAN and the ANX Private internet service. The choice of VAN or direct link technology will be negotiated on a case-by-case basis. You do not need to use the same commercial network as Dofasco because most commercial networks interconnect. You need to consider your Electronic Commerce requirements, and the costs and services, when you decide on the commercial network you will use. If you are unsure about commercial network selection, please refer to Section 2-3 for technical assistance. How do I know Dofasco received my document? Transaction set 997, the Functional Acknowledgment,
is designed
What benefits can I expect when I implement EDI? Because you no longer need to rekey the information
that you receive
Other shared benefits are:
Facilities? Dofasco will have high quality, comprehensive
and fully competitive
Implementation Checklist
2.2 Detailed Business Cycle Current/RevisedYou are familiar with our current procedure for shipping and receivingsteel. In this document, we explain the current manual procedures and how we are enhancing these procedures to communicate electronically. The detailed layout and content for all transaction sets in the electronic
2.2.1 Current Procedure![]() Facilities As you know our current procedure is very simple. When material is ready in a Dofasco shipping location and our internal system is updated, a lineup is created. An OPOR (Outside Processor Order Release) is created to enable shipment of steel and a Commitment list is prepared. This information is faxed to the Outside Processor. Depending on demand and "crisis" orders, lineups could be prepared several times a day. Upon receipt of shipment at the Outside Processor, no report is filed, unless material is damaged. 2.2.2 Revised Procedure![]() Facilities The revised procedure will entail manual as well as electronic processes. The lineup will still be faxed to the Outside Processor, but as material leaves Dofasco, an ASN transaction will be sent to the Outside Processor. Upon receipt of the steel, the Outside Processor will send Dofasco a Material Receipt transaction, acknowledging the shipment. 2.2.3 Current Procedure![]() The Outside Processor faxes or couriers the Production Reports. These are posted to Dofasco internal systems as received (there can be a gap of 12 - 24 hours). Where there are no inspectors, Dofasco monitors by phone. Production reports are sent by fax, courier or dropped off by inspectors. 2.2.4 Revised Procedure![]() The Outside Processor will send Production Reporting transactions as material is processed during the day, which will update Dofasco’s internal systems directly. This will enable Dofasco personnel to have access to accurate and timely order status. Sometimes it is necessary to reassign steel to different orders. In such cases, Dofasco will send the Outside Processor a Reapplication Advice. In some instances, the Outside Processor will automatically reassign steel based on business rules, in which case, the Outside Processor will send Dofasco a Reapplication transaction. When material is held, the Outside Processor will send a Hold transaction and when the material is released, Dofasco will send the Outside Processor a Release transaction. 2.2.5 Current Procedure![]() After processing, a Bill of Lading is created. The Customer contacts Dofasco or the Outside Processor to arrange pickup by phone. When the goods are shipped, the Outside Processor notifies Dofasco by phone/fax, and Dofasco sends an ASN transaction to the Customer. For non-ASN customers, the Outside Processor will fax to Dofasco, a “material-shipped-yesterday” list. 2.2.6 Revised Procedure![]() The Outside Processor will ship steel directly to a Customer. Upon shipment, an ASN transaction will be sent to Dofasco, who will in turn send an ASN transaction to the Customer.
2.3 Electronic Commerce Interim Support with DofascoDofasco is currently investigating a support infrastructure for EDI andother Electronic communications. In the interim, this document lists the names and numbers of personnel who will be able to assist you during your EDI implementation. 2.3.1 Support StrategyPlease feel free to call our Business and Technical experts duringyour implementation. Business Contact
EDI Technical Contact
top of page | Table of Contents |
|||||||||||||||||||||||